The Spill Prevention, Control, and Countermeasures (SPCC) regulations apply to facilities or farms that store, transfer, process, refine, use or consume oil (e.g.

crude oil, animal, soy and vegetable oils, petroleum products, etc.) in excess of the limits and from which an oil leak or spill could ultimately discharge to a surface water (i.e., storm sewer, ditch, drainage tile, river or lake).

The manager must figure out how much extra "freeboard" is necessary to hold the direct precipitation and runoff water that would occur during a 25-year 24-hour event, so that the storage will not overflow.

Then at least that much extra "freeboard" must be maintained at all times, by managing the level of the storage.

The total runoff depth is 10.84 inches plus 5.5 inches, or 16.34 inches.

Storm water volume is 95,832 x 16.34 / 12 = 130,491 cubic feet; round it to 130,000 cubic feet.

The "exception" in this part of the regulation ("4(j) below") refers to the instances where the facility must hold the direct precipitation and runoff water for the 100-yr 24-hr event (which is somewhat greater than the 25-yr 24-hr event.) Example: A concrete feedlot near holds beef cattle and has a manure storage with a five-month design case period ranging from March through July.

Normal monthly precipitation values and runoff percentages are: March 3.23 x 53% = 1.71 inches; April 3.88 x 53% = 2.06 inches; May 4.04 x 54% = 2.18 inches; June 3.75 x 60% = 2.25 inches; July 4.25 x 62% = 2.64. The beef feedlot in this example is 2.2 acres in total area (2.2 x 43,560 = 95,832 square feet.) The 25-yr, 24-hr design storm for is between 5 and 6; use 5.5 inches.

The overflow is only allowed under this permit when Special Condtions 4(h), 6(b through d), 6( h through j) and 6(l) are met for the overflowing structure.An owner/operator that certifies a facility’s SPCC Plan attests that he/she is familiar with the requirements of 40 CFR 112 and has visited and examined the facility. In addition to emergency notification requirements, facilities must provide a written report to the Region VII Environmental Protection Agency (EPA) within 60 days if more than 1,000 gallons of oil are discharged or a discharge of more than 42 gallons in each of two spill events within a 12-month period.Facilities must also provide a 30 Day Written Report Form to the Iowa Department of Natural Resources (DNR) within 30 days as outlined in the DNR Spill Reporting Guide. No discharge from large swine, poultry or veal facilities; 100-yr 24-hr storm event clause.Livestock wastes shall not be discharged from: livestock management facilities and livestock waste handling facilities, for swine, poultry or veal livestock management facilities that commence construction after April 14, 2003 and have the capacity for either: 2,500 swine each weighing 55 lbs.